top of page

Day 6

Day 6 was the final day of construction for Alabama Rural Ministry as we put the finishing touches on the 43' long bridge. Top and bottom chord bracing for guardrails were placed, as well as the 2x6 handrails running across the top. We then placed spindles 6" OC across the entire 43', as well as placed the slip tape along the 15' and 10' ramps.


Featured Posts
Check back soon
Once posts are published, you’ll see them here.
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page