Day 6
Day 6 was the final day of construction for Alabama Rural Ministry as we put the finishing touches on the 43' long bridge. Top and bottom...
Day 5
Day 5 consisted of placing the rest of the 2x6 decking as well as the 4x4 posts. The most difficult task we faced installing the 4x4...
Day 4
Construction progressed on Day 4 as we continued to place the 2x6 decking on the front end of the ramp. While crew members finished the...
Day 3
Day 3 consisted of us finishing the installation of the boards on the 18' bridge. Each board received 6 screws to be securely fastened to...
Day 2
Day two consisted of finalizing the girder placement and starting to deck the bridge with 2x6s. The installation of the decking went...
Day 1
On the first day, the emphasis was on setting the girders for the bridge. We ran into some problems because the previous group that had...